Skip to content
CMMC Compliance Strategy

Your Prime Asked About CMMC: How Subcontractors Should Answer

Travis Sands
Travis Sands

If a prime contractor asks about your CMMC status, answer with facts you can back up: your current SPRS score and date, the CMMC level your contracts need, and a dated plan for any gaps. CMMC Phase 2 is still paused, but Phase 1 is in effect, and primes are still expected to flow CMMC requirements down to subcontractors that handle FCI or CUI. A clear, honest answer keeps you on the bid list. A vague one gets you replaced.

Why is my prime asking about CMMC if Phase 2 is paused?

The DFARS rule that puts CMMC into contracts took effect on November 10, 2025. That started Phase 1, where solicitations can require a Level 1 or Level 2 self-assessment. In July 2026 the Department paused Phase 2, the step that would have added third-party (C3PAO) Level 2 certification to new contracts. As of mid-November 2026 that pause is still in place with no announced end date.

None of that removes your existing obligations. If you handle Federal Contract Information, FAR 52.204-21 still applies. If you handle Controlled Unclassified Information, DFARS 252.204-7012 and NIST SP 800-171 still apply, and your SPRS score still has to be current. The CMMC clause also tells primes to flow the requirement down to subcontractors at the right level. So your prime is doing its job when it asks.

What will the prime actually ask for?

Most supplier questionnaires come down to the same handful of items:

  • Do you handle FCI, CUI or both on our work?
  • Your current SPRS score and the date you submitted it.
  • Which CMMC level you meet today (Level 1 self, Level 2 self or Level 2 certified).
  • Whether you have a System Security Plan and a POA&M for open items.
  • Your timeline to close gaps, and who in your company owns it.
  • Sometimes: your cloud and email environment (for example, whether it meets FedRAMP Moderate or equivalent for CUI).

How do I answer if we're not ready yet?

Tell the truth and give a date. Primes deal with partly ready suppliers every day. What they can't use is a score that won't hold up, because the annual affirmation is signed by a senior official, and a wrong affirmation is a False Claims Act risk for you and a supply chain problem for them.

A good "not ready yet" answer has four parts:

  1. Scope: what data you receive from them and where it lives.
  2. Current score: your real SPRS number and date, even if it's low.
  3. Plan: the top gaps and the month you expect each one closed.
  4. Owner: one named person they can follow up with.

A simple response checklist for this quarter

StepWhat to doDone when
1. Confirm the dataList every contract and the type of data each one sends you (FCI or CUI).You can say which contracts need Level 1 and which need Level 2.
2. Check your SPRS entryConfirm a score exists, is less than a year old and matches your current environment.The score and date are ready to share.
3. Find where CUI livesMap email, file shares, ERP, CAD and laptops that touch controlled drawings or specs.You have a boundary you can draw on one page.
4. Write or refresh the SSPDescribe how each NIST 800-171 requirement is met inside that boundary.Someone outside IT can read it and follow it.
5. Build the POA&MList open items with owners and dates. Note which ones CMMC won't allow on a POA&M.Every gap has a date and an owner.
6. Send one clear replyAnswer the questionnaire with steps 1-5. Offer a short call.The prime has what it needs to keep you on the bid list.

What mistakes cost suppliers the most?

  • Posting a high score you can't defend. A 110 with no evidence is worse than an honest 70 with a plan.
  • Treating the questionnaire as an IT task. Contracts, quality and leadership all need to agree on scope.
  • Answering for the whole company when one enclave would do. A smaller, well-defined boundary is easier to secure and to explain. See our post on CUI scoping for enclaves.
  • Waiting for Phase 2 news. Your prime's deadline, not the Department's, is the one that decides the next award.

Where does outside help fit?

A preparation partner can help you scope, score and document so your answer holds up. If you later need a Level 2 certification, an independent, authorized C3PAO performs that assessment. The firm that prepares you can't also assess you, so keep those roles separate when you pick help. Our guide on how to choose a CMMC consultant covers what to ask. For scoring, start with a Level 2 self-assessment score you can defend.

FAQ

Do subcontractors need CMMC?

Yes, when the work involves FCI or CUI and the contract includes the CMMC clause. The prime must flow the requirement down at the level that matches the data the subcontractor handles.

Is CMMC still required while Phase 2 is paused?

Phase 1 is still in effect, so contracts can require Level 1 or Level 2 self-assessments. The underlying FAR 52.204-21 and DFARS 252.204-7012 obligations also still apply.

Can I share a low SPRS score with my prime?

Yes, and it's usually the right call if it's accurate and paired with a dated plan. An inflated score creates risk for you and your prime.

Our prime wants a C3PAO certificate now. Is that allowed?

A prime can set its own supplier requirements. Ask which contract clause or program drives the request, then plan around that date.

Need help answering a prime's CMMC questionnaire? Book a 30-minute CMMC discussion.

Sources: Federal Register, DFARS final rule "Assessing Contractor Implementation of Cybersecurity Requirements" (Sept. 10, 2025; effective Nov. 10, 2025), https://www.federalregister.gov/documents/2025/09/10/2025-17359; DoD CIO, About CMMC, https://dodcio.defense.gov/CMMC/About/; Hunton Andrews Kurth, "CMMC Phase 2 Remains Paused: What's Next?" (Nov. 10, 2026). Reviewed: November 23, 2026.

Share this post